Sunnybrook Hospital M Wing Expansion In simple terms, Vanbots added four levels to the M-Wing at Sunnybrook Health Sciences Centre. In no way was the project simple in the intricacies of its execution. They threaded structural steel though the very heart of the hospital, working directly over the Operating Theatres, and managing the schedule to [...]
Project Showcase
Vanbots (Carillion Canada Inc.) (Category 4 Industrial – Winner)
Posted on 14. Apr. 2011 in Project Showcase
Ira McDonald Construction Limited (Category 2 Buildings – Winner)
Posted on 14. Apr. 2011 in Project Showcase
Farncombe Digestive Health Research Institute Ira McDonald Construction is proud of the successful achievement of maintaining a safe site in a high travelled confined site location with high degree hoisting demands for material and equipment, infection control, hoarding and erection processes. The atrium is the centerpiece for the renovations. A two storey, open concept space [...]
McKay-Cocker Construction Limited (Category 3 Buildings – Winner)
Posted on 14. Apr. 2011 in Project Showcase
Stoney Creek Community Centre, YMCA and Library McKay-Cocker was selected to provide Construction Management Services for the new Stoney Creek Community Centre, YMCA and Library. The new facility features a six lane, 25 meter swimming pool, leisure pool with a movable bottom, second floor indoor running track overlooking the double gymnasium, a 25,000 square foot [...]
Aecon Buildings (Category 4 Buildings – Winner)
Posted on 14. Apr. 2011 in Project Showcase
Corus Quay Project Aecon Buildings was awarded the construction management contract to deliver the full tenant fit-out of Corus Entertainment’s new corporate headquarters. The 571,488 square foot facility, over eight floors, consolidates the operations of 24 television services, three Toronto radio stations, and more than 1100 employees. Aecon was able to facilitate some unique construction aspects, [...]
KMA Contracting Inc. (Category 2 Industrial – Winner)
Posted on 14. Apr. 2011 in Project Showcase
401 Screen Structure and Town of Halton Hills Monument KMA Contracting Inc. bid the 401 Screen Structure and Town of Halton Hills Monument as a lump sum tender to TransCanada Energy Ltd. who had agreed to provide an urban design feature to highlight the town while at the same time softening the visual impact of [...]
Eastern Construction Company Limited (Category 4 Buildings – Runner-Up)
Posted on 14. Apr. 2011 in Project Showcase
Waterfront Toronto – Sugar Beach, Sherbourne Common and Promenade Eastern Construction Company Limited has been proud to be the construction manager for the Dockside portion of the East Bayfront Precinct, a vital part of Toronto Waterfront Revitalization where, as one stakeholder put it, we have taken a parking lot and put up a paradise. Sugar [...]
Ball Construction Inc. (Category 3 Buildings – Runner-Up)
Posted on 14. Apr. 2011 in Project Showcase
Upper Canada College, William P. Wilder Arena & Sports Complex Initially, Upper Canada College tendered this project as bid-spec, but prices exceeded the budget. A design build process was then initiated, and Ball Construction Inc. through a diligent value engineering process, was successful in bringing the project in on budget, lower than other bidders, and [...]
Kiwi-Newton Construction Ltd. (Category 2 Buildings – Runner-Up)
Posted on 14. Apr. 2011 in Project Showcase
Frank Hasenfratz Centre for Excellence in Manufacturing Kiwi-Newton Construction Ltd. has completed building the Frank Hasenfratz Centre for Excellence in Manufacturing where emphasis was placed on providing the owner with a sustainable site, using water efficiently, addressing the energy and the atmosphere as well as re-using and purchasing materials that are environmentally friendly while providing [...]
Maple Reinders Constructors Ltd. (Category 4 Industrial – Runner-Up)
Posted on 14. Apr. 2011 in Project Showcase
Georgian Bluffs Biogas Energy Facility Maple Reinders Constructors Ltd. was awarded the contract to build the facility, based on an anaerobic digestion system, in which micro-organisms break down biodegradable material in the absence of oxygen, producing biogas which can be converted to electrical power. The organics to energy facility is intended to be a solution [...]
Timbro DesignBuild Contractors (Category 2 Industrial – Runner-Up)
Posted on 14. Apr. 2011 in Project Showcase
Low Bay Retrofit at Trenergy Inc. Timbro Design/Build Contractors have completed more than six projects for the two owners of Trenergy Inc., including this stage of the long term project which involves retrofitting the complete 200,000 square foot facility. All work was completed utilizing Timbro’s customized TQM program. Inspections were completed regularly by consultants, the [...]